DCWW Wye Transfer

Case Study Information

Location:

Monmouth

Start Date:

31/03/14

Duration:

16 weeks

Form of contract:

NEC3 Contract Option A

Contract Status:

Completed

Contract Status:

Completed

Contract Value:

>£150k

General

EICA Contractor for provision of MCC, PLC and EICA installation for provision of:

  • New Hydrolox Intake Screens
  • Wash Water System
  • Complex replacement MCC Changeover provision
  • UPS System
  • Profibus Networks

Design Works

Scope of works by Black & Veatch Ltd

Cabling design by CPC using a preparatory design package (Amtec).

All of the design works were in compliance with current Health & Safety regulations and best practice, IEE wiring regulations BS7671, WIMMES, DCWW Specifications and Standards with particular attention to the following; MS101, MS102, MS104, MS147, MS154, ES301, ES302, ES303, ES306, ES312, ES319, ES403, ES425, ES426 and PS102.

Health & Safety

SMSTS & FA Qualified Supervision on site for duration.

MSRA prepared for all tasks and submitted for comment by BV.

Electrical Permit Control undertaken CPC in accordance with BV Electrical Safety Rules.

Weekly Toolbox Talks Conducted.

MCC

Supply and installation of GPS Ltd Manufactured and tested Motor Control Centre.

PLC

Supply and integration of GPS Ltd software.

Synopsis

Cable Containment Design Submitted.

Power and signal cabling was installed complete with suitable containment to meet the diverse needs of the individual areas on the site.

All the power and signal cables were sized according to load / length calculations with suitable protection installed.

All the electrical works were carried out to meet the current IIE Regs: BS7671 and DCWW standards.

Documentation

A full document package was produced for each area on site containing the following documents;

  • NICEIC electrical test certificates.
  • Profitrace Reports.
  • Equipment & Instrumentation Loop Drawings.
  • Manufacturers Inspection / Test / Calibration Certificates.

Similar schemes

Capel Curig WTW-MCC Replacement

Prioress Mill WTW Enabling Works

Sub-Contractors

GPS-PLC/MCC

UPS Systems-UPS Provision & Commissioning

Discipline : EICA Installation
% split : 100
In House – % split : 85
Sub-Contracted – % split : 15

Case Study Information

Location:

Monmouth

Start Date:

31/03/14

Duration:

16 weeks

Form of contract:

NEC3 Contract Option A

Contract Status:

Completed

Contract Title:

Wye Transfer

Contract Value:

>£150k

Share:

More Case Studies

DCWW Court Farm WTW 24hr Automation

Introduction The works at Court Farm included RGF outlet actuated and hand valves, domestic inlet penstocks, service water tank, UPS and distribution boards for the

Send Us A Message