DCWW Llandegfedd Reservoir: Case Study

Share This Post

This weeks case study of Celtic Process Control’s work is from a recent project for DCWW at Llandegfedd Reservoir. The project included:

– Design, supply and install all power and control cabling as per the cable block diagrams.
– Design and supply interface marshalling boxes to couple the existing motors to the temporary variable speed drives
– Liaise with all contractors to ensure timely delivery of equipment and processes
– Modifications to existing MCC to provide a suitable control of VSDs.
– Design, supply and install required field instrumentation
– Electrical installation of field cables cable containment
– Electrical testing of new installation to BS7671 Develop control philosophy
– Full system commissioning and integration

More To Explore

Uncategorized

Accounts Manager Wanted!

Accounts Manager Job Description   Job Description: Manager of Accounts Department   Position Overview: We are seeking an experienced and highly organized Manager of the

Uncategorized

We’re recruiting!

CPC is growing rapidly and we are recruiting to several roles: SHEQ Manager Site Manager(s) DesignTechnician Approved Electricians Installation Electricians ATEX/COMPEX Inspectors  Most positions offer